Complete, in detail installation manual

 

1.  The crew lays out the borders and begins the  multi-colored fan pattern.
Back to top
2.  Centering and leveling lines are critical to a proper installation.

Back to top

3.  The crew carefully selects the correct-sized cube for placement in the pattern.
Back to top
4.  Constant review of the pattern is necessary to ensure a consistent pattern.
Back to top
5.  To add interest to the walkway, the crew modifies the pattern to an arc at the entrance.

Back to top

6.  The crew packs the cubes with a dry sand and cement mixture to achieve a uniform level.
Back to top
7. Water is sprinkled over the
stonework to bond the cubes,
resulting in a beautiful, durable walkway.